Increase the efficiency of your press section!
- Save Resources +
-
Products & Solutions
+
- Rebuilds & Performance
- Dewatering technology
- Machine cleaning and doctoring systems
- Vacuum control systems
- Fabric tensioning and guiding systems
- Consumables and wear parts
- Steam showers and rewetting systems
- Reel change systems
- Machine vision solutions
- Stock, additive and starch preparation
-
Monitoring and control technology
back
- Metering systems
-
Safety
- safetyMASTER
- iSAFETY
back - Edge and trim handling
-
Tissue Solutions
- Edge and trim handling (Tissue)
- Machine vision solutions
- Machine cleaning and doctoring systems
- Steam showers and rewetting systems
- Safety
- Fabric tensioning and guiding systems
- Vacuum control systems
- pressMASTER felt suction systems
- pressMASTER flex felt suction systems
- flowMASTER
- iFIBER
- 3D-Scanning-Service
- iDECKLE
back
- Services +
- About us +
- Careers +
Extend service life of machine clothing
Why should you think about it?
The more machine clothing you need, the more material consumption and the higher the costs.
- The more machine clothing is needed, the more material consumption and the higher the costs.
- The downtime costs for replacing machine clothing are often higher than the material costs themselves.
- Each machine covering usually requires a certain start-up time. The less often this is necessary, the better for the overall machine efficiency.
How can we support you in this?
With our know-how, products and solutions, we can help you to extend the service life of your machine clothing as follows - and all while maintaining or even improving product quality:
- Maximizing the running time of the machine clothing without impairing machine operation or product quality.
- Reduction in downtimes for replacing machine clothing and therefore an increase in overall availability.
Success Stories
Below you will find a selection of successfully implemented projects.
All projects presented…
- ... show that it is possible to save resources while reducing production cost.
- ... achieved consistent or even improved product quality.
- ... have a return on investment of a few months only taking into account the overall added value achieved.
- ... have been implemented many times - no prototypes or trial installations.
Service life of press felts increased from 4 to 5 weeks.
Savings for project implemented by IBS PPG: € 215.000 per year
TARGETS ACHIEVED
- Increased service life of felt from 4 to 5 weeks.
- Approx. 12 felts less needed per year (3x4 felt runs).
- Less consumable material - does not have to be produced/transported/disposed.
- Same or even improved product quality.
- Return on investment within a few months.
Service life of press felts increased by 25%.
Savings for project implemented by IBS PPG: € 58.000 per year
TARGETS ACHIEVED
- Reduction of the total vacuum requirement.
- Increase in felt life by 25% from 40 to 50 days.
- This saves 2 felts per year.
- Less consumable material - does not have to be produced/transported/disposed.
- More production due to less downtime.
- Same or even improved product quality.
- Return on investment within a few months.
IBS of America Corporation
3732 Profit Way
Chesapeake, VA, 23323
USA
Phone: +1 757-485-4210
E-Mail: Send inquiry