Increase the efficiency of your press section!
- REDUCE COSTS +
-
PRODUCTS & SOLUTIONS
+
- Rebuilds & Performance
- Dewatering technology
- Machine cleaning and doctoring systems
- Vacuum control systems
- Fabric tensioning and guiding systems
- Consumables and wear parts
- Steam showers and rewetting systems
- Reel change systems
- Machine vision solutions
- Stock, additive and starch preparation
- Monitoring and control technology
- Metering systems
-
Safety
- safetyMASTER
- iSAFETY
back
- Edge and trim handling
- Tissue Solutions
- SERVICES +
- ABOUT US +
- CAREERS +
EXTEND SERVICE LIFE OF MACHINE CLOTHING
THE SHORTER THE SERVICE LIFE, THE HIGHER YOUR PRODUCTION COSTS.
With targeted measures, we extend the service life of wires and felts on your paper machine, allowing your to significantly lower your production costs.
At the same time, you achieve the same or an even improved paper quality and a return on investment starting from just a few months.
WHY SHOULD YOU THINK ABOUT IT?
The shorter the service life of wires and felts, the higher the costs for materials and downtime.
- Downtime costs for replacing wires and felts are often higher than the material costs.
- Each machine clothing requires a start-up time. The less often this is needed, the better is overall machine efficiency.
HOW CAN WE SUPPORT YOU IN THIS?
While maintaining or even improving paper quality:
- Maximization of wire and felt service life
without impairing machine operation or paper quality. - Reduction of downtime for replacing machine clothing
and therefor increased overall machine availability. - …
SUCCESS STORIES
A SMALL SELECTION OF PROJECTS WE HAVE SUCCESSFULLY REALIZED.
Discover how we extend the service life of wires and felts on paper machines through targeted measures, based on our successfully implemented projects. Our case studies clearly demonstrate how you can significantly reduce your costs while maintaining or improving paper quality and achieving a return on investment starting in just a few months.
Service life of press felts increased from 4 to 5 weeks
Annual savings for project implemented by IBS PPG: 215.000 €
ACHIEVED RESULTS
- Service life of felts increased from 4 to 5 weeks.
- Approx. 12 felts less needed per year (3x4 felt runs).
- The same or even improved paper quality.
- Return on investment within a few months.
Service life of press felts increased by 25%
Annual savings for project implemented by IBS PPG: 58.000 €
ACHIEVED RESULTS
- Total vacuum requirement reduced.
- Felt life increased by 25% from 40 to 50 days.
- 2 felts less needed per year.
- Production increased due to less downtime.
- The same or even improved paper quality.
- Return on investment within a few months.
PAPER
EXPERIENCE
IBS Austria GmbH
Hauptstraße 22
8833 Teufenbach-Katsch
Austria
Phone: +43 (0) 3582 8511
E-Mail: Send inquiry



